Calculate stitch counts, thread usage, and production time for embroidery projects. Input design size and density to estimate material costs.
Based on 5500 yard spool
Total Stitch Count
25,600
Thread Usage
154 yards
Production Time
32 min 0 sec
At 800 stitches/minute
Thread Cost
$0.10
Material only (per piece)
Tip: These are estimates. Actual stitch counts vary based on design complexity, underlay, and digitization techniques.
4 × 4 inches (16.00 in²)