Curing Station Types
Conveyor Dryer (Inline Curing)
- Garments pass under heated IR lamps or circulating hot air
- Temperature range: 200–400°F
- Dwell time: Adjustable via conveyor speed (typically 60–120 seconds)
- Best for: Pretreatment, screen print flash curing, water-based ink curing
- Cost: $2,000–8,000 for entry-level; $8,000–20,000+ for industrial
Heat Press (Batch Curing)
- Heated platen applies fixed pressure to garment for set duration
- Temperature range: 250–450°F
- Dwell time: Fixed via timer (30–180 seconds)
- Best for: Final DTG curing, specialty ink curing, sublimation
- Cost: $500–3,000 for commercial; $3,000–10,000+ for high-volume
Spot Cooler or Fan
- Accelerates cooling between production runs
- Reduces idle time and increases throughput
- Essential for shops running high-volume production
Temperature Calibration
Conveyor Dryer Calibration
- Place infrared thermometer probe on garment bed under heating element.
- Set dryer to target temperature (e.g., 320°F for pretreatment).
- Allow 15–20 minutes warm-up time for stable reading.
- Check temperature at entry, middle, and exit zones.
- Adjust heating element controls if zones vary > 10°F.
- Record calibration date and results.
Heat Press Calibration
- Place IR thermometer on heat press platen.
- Close press without garment; allow 10 minutes warm-up.
- Set press to target temperature.
- Verify actual temperature matches display (often ±20°F error).
- If error > 20°F, contact manufacturer for element replacement.
- Test with a garment sample and visual inspection.
Operating Guidelines
Conveyor Dryer
- Warm-up: 15–20 minutes before production
- Conveyor Speed: Slower = higher dwell time = more curing. Typical range 2–6 feet per minute. Adjust in 0.5 FPM increments.
- Spacing: Leave 2–3 inches between garments to allow airflow.
- Garment Loading: Load garments flat, not wrinkled or bunched.
- Monitoring: Check temperature hourly with IR thermometer; log readings.
Heat Press
- Warm-up: 10–15 minutes before production
- Pressure Setting: Full pressure is standard (usually 2–3 tons clamping force). Reduce only for delicate fabrics.
- Dwell Time: Use timer; don't estimate by feel. Start at recipe (e.g., 60 seconds at 320°F) and adjust based on results.
- Cooling: Open press between garments to allow slight cooling; prevents heat buildup.
- Safety: Never force press closed; if resistance is high, check garment positioning.
Maintenance Schedule
Daily
- Visually inspect heating elements for dust or debris
- Check temperature accuracy with IR thermometer
- Clean garment bed or platen with soft cloth
- Empty garment baskets; organize workflow
Weekly
- Vacuum dust from conveyor dryer intake and exhaust
- Wipe heat press platen with damp cloth; dry thoroughly
- Check conveyor belt tension (should not slip under load)
- Test emergency stop button
Monthly
- Deep clean heating elements (use compressed air, never water)
- Calibrate thermostats against reference thermometer
- Check electrical connections for loose wires
- Lubricate conveyor belt bearings (if applicable)
Quarterly
- Replace air filters in conveyor dryer
- Inspect heating elements for cracks or discoloration
- Test temperature uniformity across entire heated area
- Check for thermostat drift and recalibrate if needed
Troubleshooting
Temperature Won't Hold Steady: Thermostat calibration drift. Recalibrate or replace thermostat.
Hot Spots or Cold Zones: Uneven heating element coverage. Check for debris blocking airflow; clean or replace heating element.
Conveyor Not Moving: Belt tension too tight or bearing seized. Adjust tension or lubricate bearing.
Garments Under-Cured: Dwell time too short, temperature too low, or incorrect chemical ratios. Increase dwell time 10–15 seconds or raise temperature 10°F.
Garments Over-Cured (Yellow/Brown): Temperature too high. Reduce by 10–15°F and test again.